← Model losses

Head-to-head comparison

openai / gpt-6-astra / medium / medium effort preferred over claude-code-cli / claude-haiku-5-5 / low / low effort · close win.

Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.

Reviewed public evidence

Task goal

Read-only planning analysis. A service has a monthly availability target99.9percent. A dashboard shows99.95percent for the first10days; the team proposes spending the remaining budget on a risky rollout. Traffic varies sharply byday, outages may be partial, and the dashboard excludes monitoring gaps. Explain the minimum evidence and decision gate for a staged rollout, including denominator, unknown intervals, rollback triggers and ownership. Avoid treating remaining calendar time as a known request budget. No tools or executed-test claims. Three numbered items, under180words.

openai / gpt-6-astra / medium / medium effort answer

1. **Establish the denominator.** Independently assessed: 99.95% over ten days does not establish spendable monthly budget. Confirm whether the SLI measures eligible requests or service time, its exclusions, monthly boundary, and partial-failure accounting. Obtain good/total counts and traffic by interval and affected population; do not average daily percentages. For request-based availability, monthly failures must remain ≤0.001 × actual monthly eligible requests; future volume is uncertain.

2. **Account for unknowns.** Identify monitoring-gap intervals, affected traffic, and independent telemetry that could reconstruct outcomes. Never count excluded gaps as successful service. Bound unknown failures and denominator uncertainty conservatively. Forecast remaining traffic under multiple scenarios; remaining calendar days are not a known request budget. Current budget headroom is unproven without this evidence.

3. **Gate staged exposure.** Proceed only with reliable telemetry, conservative projected headroom, an explicit rollout-risk allocation and reserve, and a verified rollback path. Start with a small representative canary; expand after predefined observation windows and sufficient samples. Predetermine pause/rollback thresholds for burn rate, errors, latency, and telemetry loss. Name a rollout owner, monitoring on-call, rollback executor, and expansion approver.

claude-code-cli / claude-haiku-5-5 / low / low effort answer

1. **Denominator and budget:** Measure availability as good requests divided by valid requests over the full month, not as uptime over calendar time. The budget is 0.1% of expected valid requests, and remaining budget comes from actual request counts. The dashboard's 99.95% over 10 days is a time-based figure that omits monitoring gaps, so it doesn't establish how much budget is left. Traffic varies sharply by day, so report burn per window, not per calendar day.

2. **Unknown intervals and decision gate:** Bound the budget with a best case (gaps are healthy) and a worst case (gaps count as fully failed). Approve the risky rollout only if the worst-case remaining budget still covers the rollout's worst-case burn with a stated reserve. Require gap coverage below a set threshold, and advance each stage only after a minimum request count and a window that spans normal daily traffic cycles.

3. **Rollback triggers and ownership:** Predefine multi-window burn-rate triggers (for example, fast and slow windows), plus triggers for growth in unknown intervals or loss of SLI data. The rollout owner can halt without approval, the SLO owner approves each gate, and a named monitoring owner confirms data coverage before each stage. All thresholds are placeholders for the team to set.

Primary judge's stated reason

B is preferred because confirming the SLI rather than assuming it reduces the risk of applying the wrong budget accounting, while preserving a usable staged-rollout gate. This is a weak comparative preference, not an established material quality gap; the practical impact remains uncertain, and an independent review could favor A's more explicit conservative gate.

This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.

Battle wave: 1b476a75-dc9d-420a-b880-646a1c496a4f. Pair: brp1_000807cc7cadb3ecc1397963d25ab63d6dae548ea6d725046e02478af7adff16. A separate independent review is required before calling a concern a verified factual defect. Judge disagreement is not recorded here.