← Model losses

Head-to-head comparison

openai / gpt-6-sol / xhigh / xhigh effort preferred over claude-code-cli / claude-haiku-5-5 / medium / medium effort · clear win.

Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.

Reviewed public evidence

Task goal

Read-only code review. Contract: only current lease holder may commit; lease generations increase monotonically; a worker may pause past expiry; retries keep stable operation IDs. Code: async function commit(job,lease){if(Date.now()<lease.expiresAt){await compute(job);await storeResult(job.id,job.result);await markDone(job.id);}}. WorkerA checks generation7, pauses; lease expires and B obtains generation8; A resumes. Identify the stale-write mechanism and minimal storage/transaction checks. Distinguish fencing from deduplication and explain the compute-to-commit race. Give two meaningful verification cases; do not claim execution. No tools. Answer in three numbered items, under180words.

openai / gpt-6-sol / xhigh / xhigh effort answer

1. **Stale write:** A checks expiry before `compute`, then pauses. When A resumes, its earlier check says nothing about its authority: B now holds generation 8, yet A can still call `storeResult` and `markDone` (packet line 1).

2. **Minimal fix:** At commit time, storage must atomically verify that A’s holder identity and generation still match the current lease and that it has not expired, using storage-side time. Write the result and mark the job done in that same transaction. This closes the compute-to-commit race. Fencing rejects obsolete generations; deduplication uses the stable operation ID to prevent an authorized retry from applying twice. Deduplication alone does not authorize A.

3. **Verification cases (not executed):** (a) Pause A after its generation-7 check; let B acquire generation 8 and commit; confirm A cannot overwrite B or mark completion. (b) Let a lease expire during `compute`; confirm its commit is rejected, while a current holder retrying the same operation ID applies its effect only once.

claude-code-cli / claude-haiku-5-5 / medium / medium effort answer

1. **Stale-write mechanism:** The expiry check runs once, before `compute`. A passes at generation 7, pauses, and B takes generation 8. On resume, `storeResult` and `markDone` carry no generation, so storage accepts A's stale write. The compute-to-commit gap is the problem: validity is checked at check time, not commit time. Minimal fix: write the result and done state in one transaction that succeeds only if the caller's generation is at least the stored highest generation for that job.

2. **Fencing vs. deduplication:** Fencing rejects writes from superseded generations. Deduplication, using stable operation IDs (e.g., `INSERT ... ON CONFLICT DO NOTHING`), only makes identical retries idempotent. It does not stop A's stale result from being stored first under the job ID. You need both.

3. **Verification cases:** (a) A holds generation 7 and pauses; B commits at generation 8; A resumes. Expect A's write to be rejected, with B's result and done state unchanged. (b) After generation 8 commits, A retries with the same operation ID. Expect a rejection or no-op, with no overwrite of the stored result.

Primary judge's stated reason

B provides a commit predicate that directly enforces the current-holder contract, including expiry without replacement, and verification covering that boundary. This supports a clear preference based on a substantive assurance gap, rather than a slight forced preference or a claim of observed implementation failure.

This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.

Battle wave: b628f53b-a3e5-4f4d-85d3-7e1cd2c26f1f. Pair: brp1_13fe609eb853e62b8b654da9f6e9897a17de19ce009aa53c76ee7c6c0c2b35e7. A separate independent review is required before calling a concern a verified factual defect. Judge disagreement is not recorded here.