← Model losses

Head-to-head comparison

openai / gpt-6-astra / low / low effort preferred over claude-code-cli / claude-haiku-5-5 / low / low effort · clear win.

Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.

Reviewed public evidence

Task goal

Read-only planning analysis. A service has a monthly availability target99.9percent. A dashboard shows99.95percent for the first10days; the team proposes spending the remaining budget on a risky rollout. Traffic varies sharply byday, outages may be partial, and the dashboard excludes monitoring gaps. Explain the minimum evidence and decision gate for a staged rollout, including denominator, unknown intervals, rollback triggers and ownership. Avoid treating remaining calendar time as a known request budget. No tools or executed-test claims. Three numbered items, under180words.

openai / gpt-6-astra / low / low effort answer

1. **Establish the denominator.** Confirm whether the monthly SLI measures eligible requests or service time, its scope, exclusions, and partial-failure weighting. Obtain raw good/total counts and traffic by interval and affected cohort. For request-based availability, budget is 0.001 × monthly eligible requests; the eventual denominator is unknown. Ten days at 99.95% does not establish spendable monthly headroom.

2. **Account for uncertainty.** Reconcile monitoring gaps using independent telemetry; otherwise classify them as unknown, not successful or silently excluded. Bound their possible failures and denominator impact. Require traffic scenarios, existing budget consumption, and estimated rollout exposure, including detection and rollback delay. Calendar time cannot substitute for future request volume. Hold if conservative bounds cannot demonstrate sufficient reserve.

3. **Gate each stage.** Start with a small, representative canary; expand only after predefined minimum request volume and observation duration, healthy cohort-level SLIs, and acceptable short- and long-window budget burn. Predetermine numeric stop/rollback thresholds for failures, burn, telemetry loss, and customer-impact guardrails. Name the rollout decision owner and on-call rollback executor, confirm rollback readiness, and require explicit approval before each expansion.

claude-code-cli / claude-haiku-5-5 / low / low effort answer

1. **Denominator and budget:** Measure availability as good requests divided by valid requests over the full month, not as uptime over calendar time. The budget is 0.1% of expected valid requests, and remaining budget comes from actual request counts. The dashboard's 99.95% over 10 days is a time-based figure that omits monitoring gaps, so it doesn't establish how much budget is left. Traffic varies sharply by day, so report burn per window, not per calendar day.

2. **Unknown intervals and decision gate:** Bound the budget with a best case (gaps are healthy) and a worst case (gaps count as fully failed). Approve the risky rollout only if the worst-case remaining budget still covers the rollout's worst-case burn with a stated reserve. Require gap coverage below a set threshold, and advance each stage only after a minimum request count and a window that spans normal daily traffic cycles.

3. **Rollback triggers and ownership:** Predefine multi-window burn-rate triggers (for example, fast and slow windows), plus triggers for growth in unknown intervals or loss of SLI data. The rollout owner can halt without approval, the SLO owner approves each gate, and a named monitoring owner confirms data coverage before each stage. All thresholds are placeholders for the team to set.

Primary judge's stated reason

A provides a better-supported basis for the rollout decision by requiring verification of what availability actually measures before calculating headroom. Its explicit partial-failure accounting also fits the stated scenario. This is a clear substantive preference, not merely a forced choice between equivalent presentations; it does not establish that B's proposed rollout would actually fail.

This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.

Battle wave: 1b476a75-dc9d-420a-b880-646a1c496a4f. Pair: brp1_14655ea8e321b9b91d8ef80795c9384c7a1000007d910bba5b41efbda6172a31. A separate independent review is required before calling a concern a verified factual defect. Judge disagreement is not recorded here.