← Model losses

Head-to-head comparison

claude-code-cli / claude-haiku-5-5 / medium / medium effort preferred over claude-code-cli / claude-sonnet-5-5 / high / high effort · close win.

Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.

Reviewed public evidence

Task goal

Read-only research analysis. A prototype automation increases completed tasks by30percent after launch. The rollout coincided with extra staffing, task definitions changed, and users selfselected into the pilot. Logs omit abandoned tasks; the team wants to scale based on before/after throughput. Design the smallest credible prospective experiment, define denominator and guardrails, and state an explicit scaling decision criterion. Explain the remaining limitations if random assignment is impossible. No outside sources, tools or executed-test claims. Three numbered items, under180words.

claude-code-cli / claude-haiku-5-5 / medium / medium effort answer

1. **Experiment:** Randomize users or teams, stratified by staffing level and task type, to prototype or control for 4–6 weeks. Freeze task definitions to the pre-launch version in both arms. Denominator: all tasks started in the window, with abandonment logged as non-completion, so the primary metric is completed/started. Guardrails: abandonment rate, sampled error/rework rate, median time-to-completion, and staff hours per completed task.

2. **Scaling criterion:** Scale only if the 95% CI lower bound for the prototype-minus-control completion-rate difference exceeds +5 percentage points and no guardrail worsens beyond a preregistered margin (e.g., abandonment up more than 2 points). Otherwise, hold or redesign. Point estimates alone do not justify scaling.

3. **Limitations without randomization:** Before/after throughput confounds the prototype with extra staffing, changed definitions, and self-selected users. Unobserved abandonment can also inflate completion rates. Use a matched comparison group with difference-in-differences, rebuild the baseline under the new definition, and label results observational. Residual confounding, novelty effects, and spillover through shared queues remain.

claude-code-cli / claude-sonnet-5-5 / high / high effort answer

1. **Design and denominator:** Run a prospective staggered-start pilot. Assign eligible queues or teams to automation or control by pre-registered rule, freeze task definitions, and hold staffing fixed or record it. Analyze by assignment (intent-to-treat), not by who chose to use the tool. Instrument task creation so abandoned, timed-out and reopened tasks are logged. Denominator: all tasks created or assigned. Primary metric: completions per created task, with completions per staff-hour as secondary.

2. **Guardrails:** Track abandonment, rework or reopen rate, error rate, time-to-completion, escalations, user satisfaction and staffing hours. Set noninferiority margins before launch.

3. **Scaling criterion:** Scale only if the difference-in-differences in completion rate has a 95% CI lower bound of at least +10% relative, every guardrail stays within its margin, and the result holds after staffing adjustment. Otherwise iterate or extend the pilot.

**Limitations without randomization:** Concurrent time shocks, unobserved selection, violated parallel trends and spillovers between arms remain. Historical abandonment is unrecoverable, so the 30% figure stays non-causal. Results would be associational.

Primary judge's stated reason

B is the slight forced preference because its explicit randomized primary experiment gives a clearer route to separating automation effects from self-selection. A's broader denominator and staff-hour metric counterbalance that advantage. This is not an established material quality gap; an independent review could reasonably favor A's measurement coverage.

This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.

Battle wave: f13e5017-07c5-4f83-87eb-2908e3ac5236. Pair: brp1_1af476887a82452322be802c4d9ba2e2482162d677b97aefd539270e6e0dcb3f. A separate independent review is required before calling a concern a verified factual defect. Judge disagreement is not recorded here.