Task goal
Read-only quantitative planning analysis. A team has8workerhours. JobsA,B,C each need2,3,5hours and earn5,8,13units respectively when fully completed; jobs cannot split and each can run atmostonce. Any failed job earnszero. A successprobability is1, B is0.8, C is0.7; failures consume fullhours and are independent. Choose the feasible set maximizing expected earnedunits, show the arithmetic and compare the closest alternative. Explain how sharedfailure correlation affects expected value versus risk of a zero payout. No tools or executed-test claims. Three numbered items, under180words.
claude-code-cli / claude-sonnet-5-5 / medium / medium effort answer
1. **Best set: B+C (8h), EV 15.5.** The feasible sets are:
- A+B = 5 + 0.8×8 = 11.4
- A+C = 5 + 0.7×13 = 14.1
- B+C = 6.4 + 9.1 = 15.5
- A+B+C needs 10h, so it is infeasible.
- Singles are lower: C 9.1, B 6.4, A 5.
2. **Closest alternative: A+C, EV 14.1.** It is 1.4 units below B+C. A succeeds with certainty, so A+C pays at least 5 and its zero-payout risk is 0. B+C has a zero-payout risk of 0.2×0.3 = 0.06 if failures are independent. The choice is therefore 1.4 extra expected units against a 6% chance of nothing.
3. **Correlation:** If each job's marginal success probability stays the same, the expected value of B+C stays 15.5, because expectation is linear. Correlation only changes how outcomes are spread. Positive failure correlation raises P(both fail) from 0.06 toward a ceiling of 0.2 (the minimum of 0.2 and 0.3). It also raises the odds of a full 21-unit win and makes results more bimodal. Negative correlation lowers the zero-payout risk, possibly to 0. A+C stays at zero risk regardless, because A cannot fail.
This analysis was done directly, with no team review, tools, or tests.
claude-code-cli / claude-opus-5-5 / medium / medium effort answer
1. **Best feasible set: B+C (8 hours, exactly at capacity)**
- Expected value: 0.8×8 + 0.7×13 = 6.4 + 9.1 = **15.5 units**.
- A+B+C needs 10 hours, so it is infeasible.
- Other options: A+B (5h) gives 5 + 6.4 = 11.4. C alone gives 9.1.
- Confidence: high. This is direct arithmetic on the stated inputs.
2. **Closest alternative: A+C (7 hours)**
- Expected value: 1.0×5 + 0.7×13 = 5 + 9.1 = **14.1 units**.
- B+C beats it by 1.4 units, but it uses all 8 hours and adds variance.
- With independent failures, B+C pays zero with probability 0.2×0.3 = **0.06**.
- A+C never pays zero, because A always succeeds. Its worst case is 5 units.
- A risk-averse planner might prefer A+C.
3. **Effect of shared failure correlation**
- Expected value does not change. It is a sum of each job's expected value, so B+C stays at 15.5 whatever the correlation.
- The risk of a zero payout does change. Positive correlation raises P(B and C both fail) from 0.06 up to at most min(0.2, 0.3) = **0.20** under maximal correlation.
- Negative correlation can lower that risk to 0.
- A+C keeps zero risk of a zero payout, since A cannot fail.
- Correlation therefore widens the risk gap between the two plans without changing the ranking by expected value.
Primary judge's stated reason
A receives a slight, forced preference because its correlation explanation is more consistently qualified, reducing the chance that the planner interprets every departure from independence as increasing zero-payout risk. This is not an established material quality gap: B supplies the correct directional analysis, and an independent review could reasonably reject this preference.
This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.
Battle wave: f5b59039-0963-4b86-ba60-70635ae4f5e1. Pair: brp1_3be34cf4fded1344235c727b77d4a83cb5b7de23e9944295cd59cdfa27457e9f. A separate independent review is required before calling a concern a verified factual defect. Judge disagreement is not recorded here.