openai / gpt-6-sol / low / low effort preferred over cursor / grok-4.7 / Grok 4.7 High / high effort · close win.
Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.
Reviewed public evidence
Task goal
Plan a six-week pilot of a shared equipment booking product for three departments. Evidence: 300 potential users; two designers and three developers available; budget fixed; current bookings live in spreadsheets; equipment managers must approve hazardous items; existing identity service supports login but no department roles; launch must preserve existing spreadsheet bookings; success means fewer double bookings and less manager coordination time, measured against a two-week baseline. Deliver scope and exclusions, dependency-aware weekly milestones, role and ownership model, migration and rollback plan, measurable pilot criteria and top five risks with mitigations. Show what you would defer if identity roles slip two weeks. Avoid inventing stakeholder approval or performance data. Self-contained read-only planning evaluation.
openai / gpt-6-sol / low / low effort answer
## Six-week pilot plan
**Recommendation:** Pilot one shared booking service for the three departments, with the existing spreadsheets retained as the migration record and rollback option. Use the first two weeks to establish baseline measurements and validate booking rules before changing live workflows. The fixed budget and five-person delivery team make a narrow pilot preferable to a full equipment-management system.
### Scope and exclusions
**Include:** login through the existing identity service; an equipment catalogue; availability and booking for the three departments; conflict prevention; approval by an equipment manager before a hazardous-item booking is confirmed; cancellation and status visibility; basic audit history; and exportable measures of double bookings and manager coordination time.
**Exclude:** organization-wide rollout, procurement or inventory maintenance, payments, automated policy decisions for hazardous items, and historical-data cleanup beyond what is needed to preserve and reconcile existing bookings. Department-specific permissions depend on identity roles and are not assumed available.
### Milestones and ownership
| Week | Dependency-aware milestone | Primary owner |
|---|---|---|
| 1 | Confirm pilot equipment, hazardous-item rules, manager contacts, spreadsheet owners, and how coordination time will be measured. Start the **two-week baseline** using existing spreadsheets. | Product/pilot lead with department managers; designers map workflows |
| 2 | Complete baseline; agree on booking states and migration mapping. Prototype booking and approval flows; test with representatives of all three departments. | Designers; developers assess data and identity integration |
| 3 | Build login, catalogue, availability, conflict checks, and booking workflow. Prepare a repeatable spreadsheet import and reconciliation report. | Developers |
| 4 | Add hazardous-item approval, audit events, measurement export, and department-role integration **if available**. Test concurrency and permission boundaries. | Developers; equipment managers validate approval flow |
| 5 | Rehearse import and rollback against copies of the spreadsheets. Resolve discrepancies; run a limited pilot with designated users and daily reconciliation. | Developers operate migration; spreadsheet owners verify records |
| 6 | Expand to the agreed pilot group across all three departments if checks pass. Measure outcomes against baseline, document issues, and decide whether to continue, revise, or roll back. | Pilot lead decides with department representatives; developers report evidence |
The **pilot lead** owns scope, schedule, and the go/no-go recommendation, not unrecorded stakeholder approval. The **two designers** own workflow research, accessibility, and usability checks. The **three developers** own implementation, tests, import/export, operations, and measurement instrumentation; they should assign one accountable owner for migration and one for identity/security. **Equipment managers** own hazardous-item approval decisions. **Department spreadsheet owners** verify migrated bookings and manage the fallback records. These are proposed responsibilities to confirm in week 1.
### Migration and rollback
Inventory and preserve the current spreadsheets; capture a dated, read-only snapshot before each import. Normalize equipment identifiers, times, booking owners, and statuses; import all future bookings needed for the pilot, flag ambiguous or overlapping entries for human resolution, and reconcile record counts and individual future bookings with spreadsheet owners. Do not silently overwrite an existing booking. At cutover, designate one booking source of truth and communicate where new requests must go; keep the snapshot and an export of every subsequent pilot booking.
Define rollback triggers before launch, including lost or materially incorrect bookings, uncontained double bookings, or an unsafe hazardous-item approval path. On rollback, pause new product bookings, export and reconcile bookings made since cutover into the spreadsheets, have managers verify hazardous-item status, and only then resume spreadsheet booking. Avoid simultaneous writes to both systems without a reconciliation owner.
### Pilot criteria
Record actual values during the two-week baseline; no baseline or target is assumed to exist yet. Use the same three departments, equipment set, definitions, and observation method for comparison. Count **double bookings** as overlapping confirmed bookings for the same item and time, reporting both the count and rate per 100 confirmed bookings. Measure **manager coordination time** as minutes spent arranging, clarifying, resolving, or approving bookings, tracked by participating managers using the same method in baseline and pilot; report total minutes and minutes per completed booking. Set numerical improvement thresholds with stakeholders before week 5 rather than declaring success from unagreed figures.
Also require preservation of verified pre-existing future bookings, no hazardous-item booking confirmed without its required approval, and a reconciled booking/export trail. Report sample sizes, missing observations, and any change in booking volume; a six-week schedule leaves limited post-launch observation time, so results may justify extending measurement rather than claiming a conclusive improvement.
### Top five risks
| Risk | Mitigation |
|---|---|
| Spreadsheet inconsistencies or omitted bookings | Snapshot, dry-run import, exception queue, owner-by-owner reconciliation, and rollback export. |
| Identity roles arrive late or permissions leak across departments | Do not infer roles from login; test authorization explicitly and use the reduced scope below. |
| Hazardous items bypass approval | Server-side approval gate; manager validation and negative-path tests before launch. |
| Concurrent requests still produce double bookings | Enforce conflict checks at booking commit, test races, and monitor conflicts daily. |
| Adoption or measurement is too weak to demonstrate impact | Train pilot participants, make the booking source clear, instrument events, and use consistent baseline/pilot time logs and denominators. |
**If department identity roles slip two weeks:** Defer department-scoped permissions, broad self-service access, and any cross-department rules that require trusted department identity. Continue building and testing the shared booking, import, conflict, and approval foundations. A limited pilot can proceed only if a separately verified, controlled participant roster and server-side access restrictions meet the security needs; otherwise postpone live access rather than treat login alone as department authorization. Keep the baseline and migration rehearsal on schedule, and move outcome measurement to after a safe launch.
cursor / grok-4.7 / Grok 4.7 High / high effort answer
The six-week pilot should dual-run a single shared booking calendar beside the current spreadsheets. Login uses the existing identity service. Department roles stay off the critical path. Success is a lower double-booking rate and less manager coordination time in weeks 5–6 than in a frozen two-week spreadsheet baseline from weeks 1–2.
**Confidence:** medium on the dependency order, low on whether two designers and three developers can finish import, conflict checks, and fail-closed approval by week 4. No velocity, schema, identity contract, baseline counts, or budget figure is in the supplied evidence.
## 1. Recommendation
### Scope
- One shared equipment calendar for the three departments, covering only items already present in the spreadsheets.
- Login through the existing identity service, using the subject id only.
- Non-destructive import of current spreadsheet bookings so those intervals still occupy the calendar.
- Conflict check on the combined occupancy: imported rows plus pilot bookings.
- Hazardous items stay unconfirmed until an equipment manager approves. Unknown hazard class stays unconfirmed.
- A local approver allow-list of identity subject ids.
- A 14-day baseline while spreadsheet behavior is unchanged, then a 14-day live comparison in weeks 5–6.
- Daily reconciliation and a rehearsed export back to a spreadsheet.
### Exclusions
- Identity-service department roles, department-scoped permissions, and automatic approval routing from identity claims.
- Replacing or editing the original spreadsheet files.
- Extra departments, equipment types absent from the spreadsheets, native mobile apps, billing, maintenance, depreciation, and per-department custom calendars.
- Extra headcount or vendor spend. The budget figure is not in evidence, so the plan uses only the five people named.
- Any numeric success target. “Fewer” is the only success direction supplied. No baseline rate or duration is supplied.
### Dependency-aware weeks
Week 1 opens the baseline and does not change how people book. Freeze two definitions before counting starts: a double booking is two or more overlapping confirmed reservations for the same equipment item; coordination time is manager minutes spent resolving conflicts and arranging equipment, counted separately from minutes spent on required hazard approvals. Take a read-only spreadsheet copy, inventory columns and existing overlaps, and prove login returns a subject id. Design four states: preserved booking, conflict, pending approval, denied.
Week 2 ends the 14-day baseline and stores that record unchanged. Build import from the copy so original files stay untouched. Each imported row keeps a pointer to its spreadsheet row. Same equipment and overlapping times conflict. A pending hazardous request holds the slot so approval delay does not create a second confirmed booking.
Week 3 turns on authenticated use against imported occupancy. Non-hazardous requests confirm when the slot is free. Hazardous and unknown-class requests stay pending. Only an allow-listed manager can approve or deny. An empty allow-list blocks hazardous confirmation.
Week 4 is the launch gate. Re-import spreadsheet edits on a short interval, publish a diff, and rehearse rollback: disable new pilot writes and export pilot-originated bookings into a spreadsheet with the source columns. Go live in week 5 only if preservation, login, conflict checks, fail-closed hazard handling, and the rollback rehearsal are done. Identity department roles join this week only if the contract is already finished. Otherwise they wait until after week 6.
Weeks 5–6 are the comparison window for all three departments on the preserved equipment set. Count overlaps on the combined import plus pilot calendar, so bookings that remain only in a spreadsheet still count. On the last day, compare the two 14-day rates and the two coordination-time totals with booking volume reported beside them. If the baseline record is missing or the definitions changed, the result is inconclusive.
### Roles and ownership
- Designer 1 owns the booking and conflict flows and drafts the metric definitions. Designer 2 owns the approval-queue states and is backup for the calendar flows.
- Developer 1 owns import, reconciliation, and rollback export. Developer 2 owns the booking and conflict rules. Developer 3 owns login, the interim approver allow-list, and metric events. Each developer backs up one of the others.
- Equipment managers approve or deny hazardous requests and are the source of the hazard classification and the allow-list. Their identities are not in the evidence, so Developer 3 cannot fill that list alone.
- Identity-service owners own department roles. They are outside the five-person team.
- A single pilot decision owner is unfilled. One person must be named to freeze definitions, call the week-4 gate, and call the week-6 continue-or-roll-back read. None of the supplied roles covers that.
### Migration and rollback
Copy the spreadsheets at the start and import from the copy. Do not write to the original files. Keep re-importing later spreadsheet edits during the pilot so both channels reserve time. Pilot rows carry `source=pilot`; imported rows carry `source=spreadsheet`.
Rollback is the week-4 export plus a switch that stops pilot creates. Original spreadsheet rows remain in the original files. Pilot-originated rows survive only if the export ran. After rollback, the interim allow-list is unused. No identity-service data is changed, so there is nothing to undo there.
### Measurable pilot criteria
Compare weeks 5–6 with weeks 1–2.
- Double-booking rate: overlapping confirmed reservations divided by confirmed booking-days. Success is a lower rate. Report raw counts and total booking volume in both windows.
- Manager coordination minutes, using the week-1 definition. Success is a lower total. Report hazard-approval minutes separately and do not treat them as the success measure.
- Hard stops, each with a required count of zero: confirmed hazardous bookings with no approval record; original spreadsheet rows missing from the source files; active imported intervals missing from the calendar.
- Week-6 result is continue only when both rates are lower and every hard stop is zero. Otherwise roll back or record inconclusive. Do not fill in a percentage target. None was supplied.
### Top five risks and mitigations
1. The baseline is skipped or redefined after week 2, so the comparison is invalid. Freeze definitions in week 1 and store the week-2 record unchanged.
2. People keep booking in spreadsheets and the pilot, hiding overlaps. Re-import on a short interval and score doubles on the combined calendar.
3. A two-week identity-role slip is treated as a launch blocker and consumes the only comparison window. Roles are optional after week 4; the interim allow-list covers hazardous approval.
4. The approver allow-list is empty or hazard class is incomplete, so hazardous equipment cannot move. Collect manager subject ids and the hazard list before week 3. Unknown class stays pending.
5. Fixed people and fixed budget absorb per-department customization. Keep one calendar, the spreadsheet equipment set, and the week-4 cut line: if import or conflict checks are late, drop convenience filters before dropping preservation, conflict checks, or fail-closed approval.
### If identity roles slip two weeks
Assume the role contract was aimed at the week-4 gate and arrives around week 6. Leave it off through the comparison window so authorization does not change mid-measurement.
Defer identity department membership, identity equipment-manager claims, permission filtering by department, approval routing derived from those claims, and retirement of the local allow-list.
Keep login, the shared three-department calendar, department as a display label taken from the spreadsheet when that column exists, the local allow-list, spreadsheet re-import, rollback export, and both success measures. One shared pool is the fallback when the spreadsheets have no department field. Revisit identity roles only after the week-6 read, and only if the pilot continues.
## 2. Alternatives considered
Retiring the spreadsheets at launch fails the preservation requirement and leaves no rollback copy. Holding the pilot until department roles exist puts a non-critical dependency on the only two weeks that can be compared with the baseline. Leaving a pending hazardous request unheld frees the equipment sooner and recreates the double-booking failure the pilot is scored on. Separate calendars per department exceed the fixed five-person capacity. Manager satisfaction as the success measure would replace the two outcomes the pilot is required to use.
A lower double-booking rate is a weak result if confirmed booking volume collapses, because people may have left both channels. Publish volume next to the rate.
## 3. Missing evidence and consequences
These are absent from the supplied evidence: spreadsheet columns, row counts, editors, and overlap grain; the hazard list and current approval path; manager subject ids; the identity login contract and any real role delivery date; baseline counts and coordination minutes; the budget amount; equipment counts; whether all 300 people are in the three departments. Until a read-only spreadsheet sample and a login spike exist, weeks 2–4 stay conditional. An empty manager allow-list blocks hazardous confirmation. A missed week-1 baseline makes week 6 inconclusive. No decision owner means the week-4 gate and the week-6 read have no named caller.
## 4. Next useful action
Freeze the two metric definitions and start the 14-day spreadsheet baseline now, in parallel with a read-only schema sample and a login subject-id spike. Collect the hazardous-item list and approver subject ids before any pilot create is enabled.
Primary judge's stated reason
A receives a weak, forced preference because its single-source cutover more directly supports reducing double bookings and coordination work. B offers a better-defined two-week live comparison. The balance does not establish a material quality gap, and an independent review could reasonably favor B's measurement design.
This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.
Battle wave: ebca1385-ed0b-4cca-a716-308a4a3f0509. Pair: brp1_40534e308971c878f8e6d665beea4efa797fe200b18ebbfd27de77f52d685076. A separate independent review is required before calling a concern a verified factual defect. Judge disagreement is not recorded here.