cursor / grok-4.7 / Grok 4.7 High / high effort preferred over nvidia / nvidia/nemotron-3-super-120b-a12b / none / unknown effort · clear win.

Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.

Reviewed public evidence

Task goal

Plan a six-week pilot of a shared equipment booking product for three departments. Evidence: 300 potential users; two designers and three developers available; budget fixed; current bookings live in spreadsheets; equipment managers must approve hazardous items; existing identity service supports login but no department roles; launch must preserve existing spreadsheet bookings; success means fewer double bookings and less manager coordination time, measured against a two-week baseline. Deliver scope and exclusions, dependency-aware weekly milestones, role and ownership model, migration and rollback plan, measurable pilot criteria and top five risks with mitigations. Show what you would defer if identity roles slip two weeks. Avoid inventing stakeholder approval or performance data. Self-contained read-only planning evaluation.

cursor / grok-4.7 / Grok 4.7 High / high effort answer

The six-week pilot should dual-run a single shared booking calendar beside the current spreadsheets. Login uses the existing identity service. Department roles stay off the critical path. Success is a lower double-booking rate and less manager coordination time in weeks 5–6 than in a frozen two-week spreadsheet baseline from weeks 1–2.

**Confidence:** medium on the dependency order, low on whether two designers and three developers can finish import, conflict checks, and fail-closed approval by week 4. No velocity, schema, identity contract, baseline counts, or budget figure is in the supplied evidence.

## 1. Recommendation

### Scope
- One shared equipment calendar for the three departments, covering only items already present in the spreadsheets.
- Login through the existing identity service, using the subject id only.
- Non-destructive import of current spreadsheet bookings so those intervals still occupy the calendar.
- Conflict check on the combined occupancy: imported rows plus pilot bookings.
- Hazardous items stay unconfirmed until an equipment manager approves. Unknown hazard class stays unconfirmed.
- A local approver allow-list of identity subject ids.
- A 14-day baseline while spreadsheet behavior is unchanged, then a 14-day live comparison in weeks 5–6.
- Daily reconciliation and a rehearsed export back to a spreadsheet.

### Exclusions
- Identity-service department roles, department-scoped permissions, and automatic approval routing from identity claims.
- Replacing or editing the original spreadsheet files.
- Extra departments, equipment types absent from the spreadsheets, native mobile apps, billing, maintenance, depreciation, and per-department custom calendars.
- Extra headcount or vendor spend. The budget figure is not in evidence, so the plan uses only the five people named.
- Any numeric success target. “Fewer” is the only success direction supplied. No baseline rate or duration is supplied.

### Dependency-aware weeks
Week 1 opens the baseline and does not change how people book. Freeze two definitions before counting starts: a double booking is two or more overlapping confirmed reservations for the same equipment item; coordination time is manager minutes spent resolving conflicts and arranging equipment, counted separately from minutes spent on required hazard approvals. Take a read-only spreadsheet copy, inventory columns and existing overlaps, and prove login returns a subject id. Design four states: preserved booking, conflict, pending approval, denied.

Week 2 ends the 14-day baseline and stores that record unchanged. Build import from the copy so original files stay untouched. Each imported row keeps a pointer to its spreadsheet row. Same equipment and overlapping times conflict. A pending hazardous request holds the slot so approval delay does not create a second confirmed booking.

Week 3 turns on authenticated use against imported occupancy. Non-hazardous requests confirm when the slot is free. Hazardous and unknown-class requests stay pending. Only an allow-listed manager can approve or deny. An empty allow-list blocks hazardous confirmation.

Week 4 is the launch gate. Re-import spreadsheet edits on a short interval, publish a diff, and rehearse rollback: disable new pilot writes and export pilot-originated bookings into a spreadsheet with the source columns. Go live in week 5 only if preservation, login, conflict checks, fail-closed hazard handling, and the rollback rehearsal are done. Identity department roles join this week only if the contract is already finished. Otherwise they wait until after week 6.

Weeks 5–6 are the comparison window for all three departments on the preserved equipment set. Count overlaps on the combined import plus pilot calendar, so bookings that remain only in a spreadsheet still count. On the last day, compare the two 14-day rates and the two coordination-time totals with booking volume reported beside them. If the baseline record is missing or the definitions changed, the result is inconclusive.

### Roles and ownership
- Designer 1 owns the booking and conflict flows and drafts the metric definitions. Designer 2 owns the approval-queue states and is backup for the calendar flows.
- Developer 1 owns import, reconciliation, and rollback export. Developer 2 owns the booking and conflict rules. Developer 3 owns login, the interim approver allow-list, and metric events. Each developer backs up one of the others.
- Equipment managers approve or deny hazardous requests and are the source of the hazard classification and the allow-list. Their identities are not in the evidence, so Developer 3 cannot fill that list alone.
- Identity-service owners own department roles. They are outside the five-person team.
- A single pilot decision owner is unfilled. One person must be named to freeze definitions, call the week-4 gate, and call the week-6 continue-or-roll-back read. None of the supplied roles covers that.

### Migration and rollback
Copy the spreadsheets at the start and import from the copy. Do not write to the original files. Keep re-importing later spreadsheet edits during the pilot so both channels reserve time. Pilot rows carry `source=pilot`; imported rows carry `source=spreadsheet`.

Rollback is the week-4 export plus a switch that stops pilot creates. Original spreadsheet rows remain in the original files. Pilot-originated rows survive only if the export ran. After rollback, the interim allow-list is unused. No identity-service data is changed, so there is nothing to undo there.

### Measurable pilot criteria
Compare weeks 5–6 with weeks 1–2.

- Double-booking rate: overlapping confirmed reservations divided by confirmed booking-days. Success is a lower rate. Report raw counts and total booking volume in both windows.
- Manager coordination minutes, using the week-1 definition. Success is a lower total. Report hazard-approval minutes separately and do not treat them as the success measure.
- Hard stops, each with a required count of zero: confirmed hazardous bookings with no approval record; original spreadsheet rows missing from the source files; active imported intervals missing from the calendar.
- Week-6 result is continue only when both rates are lower and every hard stop is zero. Otherwise roll back or record inconclusive. Do not fill in a percentage target. None was supplied.

### Top five risks and mitigations
1. The baseline is skipped or redefined after week 2, so the comparison is invalid. Freeze definitions in week 1 and store the week-2 record unchanged.
2. People keep booking in spreadsheets and the pilot, hiding overlaps. Re-import on a short interval and score doubles on the combined calendar.
3. A two-week identity-role slip is treated as a launch blocker and consumes the only comparison window. Roles are optional after week 4; the interim allow-list covers hazardous approval.
4. The approver allow-list is empty or hazard class is incomplete, so hazardous equipment cannot move. Collect manager subject ids and the hazard list before week 3. Unknown class stays pending.
5. Fixed people and fixed budget absorb per-department customization. Keep one calendar, the spreadsheet equipment set, and the week-4 cut line: if import or conflict checks are late, drop convenience filters before dropping preservation, conflict checks, or fail-closed approval.

### If identity roles slip two weeks
Assume the role contract was aimed at the week-4 gate and arrives around week 6. Leave it off through the comparison window so authorization does not change mid-measurement.

Defer identity department membership, identity equipment-manager claims, permission filtering by department, approval routing derived from those claims, and retirement of the local allow-list.

Keep login, the shared three-department calendar, department as a display label taken from the spreadsheet when that column exists, the local allow-list, spreadsheet re-import, rollback export, and both success measures. One shared pool is the fallback when the spreadsheets have no department field. Revisit identity roles only after the week-6 read, and only if the pilot continues.

## 2. Alternatives considered
Retiring the spreadsheets at launch fails the preservation requirement and leaves no rollback copy. Holding the pilot until department roles exist puts a non-critical dependency on the only two weeks that can be compared with the baseline. Leaving a pending hazardous request unheld frees the equipment sooner and recreates the double-booking failure the pilot is scored on. Separate calendars per department exceed the fixed five-person capacity. Manager satisfaction as the success measure would replace the two outcomes the pilot is required to use.

A lower double-booking rate is a weak result if confirmed booking volume collapses, because people may have left both channels. Publish volume next to the rate.

## 3. Missing evidence and consequences
These are absent from the supplied evidence: spreadsheet columns, row counts, editors, and overlap grain; the hazard list and current approval path; manager subject ids; the identity login contract and any real role delivery date; baseline counts and coordination minutes; the budget amount; equipment counts; whether all 300 people are in the three departments. Until a read-only spreadsheet sample and a login spike exist, weeks 2–4 stay conditional. An empty manager allow-list blocks hazardous confirmation. A missed week-1 baseline makes week 6 inconclusive. No decision owner means the week-4 gate and the week-6 read have no named caller.

## 4. Next useful action
Freeze the two metric definitions and start the 14-day spreadsheet baseline now, in parallel with a read-only schema sample and a login subject-id spike. Collect the hazardous-item list and approver subject ids before any pilot create is enabled.

nvidia / nvidia/nemotron-3-super-120b-a12b / none / unknown effort answer

# Evidence for Six-Week Pilot Plan: Shared Equipment Booking Product

## Conclusion
A six-week pilot for a shared equipment booking product targeting 300 potential users across three departments is feasible with two designers and three developers, assuming budget covers essential tooling and no major scope creep. The pilot should focus on core booking workflows, hazardous item approvals, and minimal viable integrations while preserving existing spreadsheet bookings during transition. Success criteria should measure reduction in double bookings and manager coordination time against a two-week baseline.

## Scope and Exclusions
**In Scope:**
- Core booking interface (view availability, reserve equipment, cancel/modify bookings)
- Hazardous equipment approval workflow (manager notifications and approvals)
- Basic reporting dashboard (booking volume, double booking incidents)
- Integration with existing identity service for authentication
- Migration tools to import existing spreadsheet bookings at pilot start
- User training materials and support channels

**Excluded:**
- Department role-based access controls (deferred if identity roles slip)
- Advanced analytics or predictive scheduling
- Equipment maintenance tracking or calibration management
- Mobile app development (web-only pilot)
- Integration with ERP/FM systems beyond identity service
- Automated equipment availability sensors (manual status updates only)

## Dependency-Aware Weekly Milestones

**Week 1: Foundation & Preparation**
- Finalize requirements with department stakeholders (designers lead)
- Set up development environment and CI/CD pipeline (developers)
- Design core booking screens and approval workflows (designers)
- Build spreadsheet import utility for existing bookings (developers)
- Configure identity service integration (developers)

**Week 2: Core Functionality MVP**
- Implement equipment catalog management (developers)
- Build basic booking interface with conflict detection (developers)
- Create hazardous item approval workflow (developers)
- Begin user acceptance testing with equipment managers (designers/developers)
- Prepare migration scripts for historical bookings

**Week 3: Testing & Refinement**
- Conduct internal QA and usability testing (all team)
- Fix critical bugs and usability issues identified
- Implement booking modification/cancellation features
- Develop training materials and quick reference guides
- Run parallel test with spreadsheet bookings to validate migration

**Week 4: Pilot Launch & Monitoring**
- Launch pilot to all 300 potential users
- Monitor system performance and user adoption
- Provide live support during first 48 hours
- Collect initial feedback and issue reports
- Begin tracking double booking incidents and manager coordination time

**Week 5: Optimization & Feedback**
- Analyze pilot metrics and user feedback
- Implement priority fixes and usability improvements
- Conduct follow-up training sessions as needed
- Prepare interim success report
- Validate hazardous approval workflow effectiveness

**Week 6: Evaluation & Transition Planning**
- Final success measurement against baseline
- Document lessons learned and user satisfaction
- Create formal recommendation for full rollout
- Develop rollback procedures if needed
- Knowledge transfer to operations team

## Role and Ownership Model
- **Product Owner:** Equipment manager representative (rotating among departments)
- **Design Lead:** Senior designer responsible for UX/UI and user testing
- **Development Lead:** Senior developer overseeing technical implementation and quality
- **Equipment Managers:** Responsible for hazardous item approvals and department-specific equipment rules
- **IT Support:** Identity service integration and infrastructure monitoring
- **All Developers:** Full-stack implementation with shared ownership of core modules
- **Designers:** User research, interface design, and usability testing

## Migration and Rollback Plan

**Migration Strategy:**
1. Week 1: Build import tool for existing spreadsheet bookings
2. Week 3: Test migration with sample data and validate integrity
3. Week 4: At pilot launch, import all active bookings from spreadsheets
4. Maintain spreadsheets as read-only archive during pilot
5. Implement daily sync from new system to spreadsheets for backup

**Rollback Triggers:**
- System instability affecting >20% of users
- Critical security vulnerabilities discovered
- Unable to maintain hazardous approval workflow integrity
- Widespread user rejection preventing meaningful usage data

**Rollback Procedure:**
1. Redirect users to legacy spreadsheet system
2. Export new bookings from pilot system to spreadsheets
3. Disable new system access while preserving data for analysis
4. Communicate transition timeline and support availability
5. Conduct post-mortem to identify root causes

## Measurable Pilot Criteria
**Primary Success Metrics (vs. Two-Week Baseline):**
- Reduction in double bookings: Target ≥40% decrease
- Manager coordination time per booking: Target ≥30% reduction
- User adoption rate: Target ≥60% of potential users active weekly
- Hazardous item approval time: Target ≤24 hours from request to approval
- User satisfaction: Target ≥4/5 average rating on post-pilot survey

**Measurement Approach:**
- Automated tracking of booking conflicts in new system
- Time-tracking surveys for managers before/after pilot
- System login and usage analytics
- Manual audit of hazardous approval timestamps
- Standardized user satisfaction survey at pilot conclusion

## Top Five Risks with Mitigations

1. **User Resistance to Change**
   - Mitigation: Early involvement in design, comprehensive training, super-user champions in each department, feedback incorporation throughout pilot

2. **Integration Delays with Identity Service**
   - Mitigation: Begin integration in Week 1, use mock authentication initially, maintain fallback to temporary credentials if needed

3. **Inaccurate Baseline Data**
   - Mitigation: Use two-week period immediately preceding pilot, collect multiple data points, validate with department managers

4. **Hazardous Approval Workflow Bottlenecks**
   - Mitigation: Implement escalation notifications, mobile approval options, backup approver designation, SLA tracking in system

5. **Data Migration Errors**
   - Mitigation: Build validation checks into import tool, run parallel systems for first week, maintain spreadsheets as source of truth until validated

## Deferments if Identity Roles Slip Two Weeks
If department role-based access controls in the identity service are delayed by two weeks:
- **Defer:** Role-based UI customization (different views per department)
- **Defer:** Automated department-specific equipment restrictions
- **Defer:** Role-based reporting and analytics segmentation
- **Defer:** Self-service department equipment budget tracking
- **Keep:** Core booking functionality, hazardous approvals, basic reporting, spreadsheet migration, identity service authentication (without roles)
- **Implement Workaround:** Use department designation in user profiles managed within the booking application itself (not identity service) for basic filtering needs
- **Adjust Timeline:** Shift role-dependent features to post-pilot enhancement phase (weeks 7-8) if pilot succeeds

This approach preserves the core pilot value proposition while accommodating the identity service delay, ensuring we can still measure the primary success criteria of reduced double bookings and manager coordination time.

Primary judge's stated reason

A is preferred for a materially more operationally grounded plan: explicit prelaunch gates, a scheduled unchanged two-week baseline, and a subject-ID approver allow-list that keeps hazardous authorization independent of delayed department roles. B mentions a pre-pilot baseline and retains hazardous approvals, but does not comparably schedule baseline collection or specify how approvers are authorized without identity roles. These differences support a clear preference in planning assurance, not a claim of observed implementation failure. B's proposed numeric targets are not treated as invented performance observations.

This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.