openai / gpt-6-sol / medium / medium effort preferred over claude-code-cli / claude-haiku-5-5 / medium / medium effort · close win.
Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.
Reviewed public evidence
Task goal
Read-only research analysis. A prototype automation increases completed tasks by30percent after launch. The rollout coincided with extra staffing, task definitions changed, and users selfselected into the pilot. Logs omit abandoned tasks; the team wants to scale based on before/after throughput. Design the smallest credible prospective experiment, define denominator and guardrails, and state an explicit scaling decision criterion. Explain the remaining limitations if random assignment is impossible. No outside sources, tools or executed-test claims. Three numbered items, under180words.
openai / gpt-6-sol / medium / medium effort answer
1. Run a prospective, concurrent pilot: randomly assign eligible users or teams to automation or usual workflow before tasks arrive. Keep staffing comparable, freeze task definitions, and pre-set the duration and sample size. Analyze everyone as assigned, including nonusers.
2. Use **all eligible tasks entering the workflow** as the denominator, including abandoned tasks; measure completed tasks against that total. Also track completions per staffed hour. Guardrails: errors, rework, task time, user workload, and adverse outcomes. Record these for both groups.
3. Scale only if the pre-specified analysis shows at least a 10% improvement in completion rate, its uncertainty interval excludes no improvement, and no guardrail materially worsens. The reported 30% before/after increase cannot establish causation. If randomization is impossible, compare matched groups over the same period with identical logging and definitions, but staffing differences, selection, and unmeasured trends can still explain the result.
claude-code-cli / claude-haiku-5-5 / medium / medium effort answer
1. **Experiment:** Randomize users or teams, stratified by staffing level and task type, to prototype or control for 4–6 weeks. Freeze task definitions to the pre-launch version in both arms. Denominator: all tasks started in the window, with abandonment logged as non-completion, so the primary metric is completed/started. Guardrails: abandonment rate, sampled error/rework rate, median time-to-completion, and staff hours per completed task.
2. **Scaling criterion:** Scale only if the 95% CI lower bound for the prototype-minus-control completion-rate difference exceeds +5 percentage points and no guardrail worsens beyond a preregistered margin (e.g., abandonment up more than 2 points). Otherwise, hold or redesign. Point estimates alone do not justify scaling.
3. **Limitations without randomization:** Before/after throughput confounds the prototype with extra staffing, changed definitions, and self-selected users. Unobserved abandonment can also inflate completion rates. Use a matched comparison group with difference-in-differences, rebuild the baseline under the new definition, and label results observational. Residual confounding, novelty effects, and spillover through shared queues remain.
Primary judge's stated reason
The forced, weak preference is B: its eligible-arrival denominator and explicit inclusion of assigned nonusers better protect the prospective comparison against selective participation and task initiation. A's stronger scaling gate substantially counterbalances this advantage. This is not an established material quality difference, and an independent review could reasonably prefer A.
This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.
Battle wave: f13e5017-07c5-4f83-87eb-2908e3ac5236. Pair: brp1_4372ab7af0cf33be2b9ad896e3e34e0fa5ec0b2ced523705243e933573016507. A separate independent review is required before calling a concern a verified factual defect. Judge disagreement is not recorded here.