openai / gpt-6-luna / low / low effort preferred over claude-code-cli / claude-opus-5-5 / medium / medium effort · close win.
Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.
Reviewed public evidence
Task goal
Read-only planning analysis. A service has a monthly availability target99.9percent. A dashboard shows99.95percent for the first10days; the team proposes spending the remaining budget on a risky rollout. Traffic varies sharply byday, outages may be partial, and the dashboard excludes monitoring gaps. Explain the minimum evidence and decision gate for a staged rollout, including denominator, unknown intervals, rollback triggers and ownership. Avoid treating remaining calendar time as a known request budget. No tools or executed-test claims. Three numbered items, under180words.
openai / gpt-6-luna / low / low effort answer
1. Do not authorize rollout from the first 10 days’ 99.95% dashboard figure alone. Establish the SLO’s measurement window and denominator: eligible requests, including how partial failures and traffic variation are counted. Translate the 99.9% target into a request-weighted budget only with that denominator; calendar days do not reveal remaining request budget.
2. Reconcile monitoring gaps before deciding. Identify their intervals and estimate availability from independent telemetry where possible; otherwise mark them unknown, not successful. Bound their possible impact and require the resulting uncertainty to fit within an explicitly approved risk margin. The packet supplies no traffic, gap, or partial-outage data, so remaining budget cannot be determined.
3. Gate each rollout stage on current budget evidence, health indicators, and named decision authority. Define measurable rollback thresholds and observation windows in advance, including for partial outages; assign an on-call rollback owner and an accountable SLO approver. Pause or roll back on threshold breach, missing telemetry, or budget uncertainty beyond the approved margin.
claude-code-cli / claude-opus-5-5 / medium / medium effort answer
1. **Denominator and budget.** Recompute the SLI from request-weighted good and total events, not dashboard time. Count partial outages by the fraction of requests that failed. Remaining budget equals 0.1% of the *forecast* monthly total requests, minus bad requests so far. Traffic swings sharply by day, so the forecast is a range. Use its low bound. "Twenty days left" is not a request budget.
2. **Unknown intervals.** Excluded monitoring gaps are not good time. Measure each gap's duration and its likely traffic. Either count it as bad, or bound it with independent sources such as load-balancer logs or client telemetry. Recompute the 99.95% under that worst case. If little budget remains (illustrative threshold: under half), there is no rollout.
3. **Gate, rollback and ownership.** Stage the rollout as canary, then about 10%, about 50%, then full, with a hold at each stage. Roll back automatically on SLI breach, a fast burn-rate alert, or a stage using more than its preset slice of remaining budget. The rollback path must be rehearsed. One named rollout owner holds abort authority, and the SLO owner or on-call approves each stage. Pause if traffic forecasts or monitoring degrade.
Primary judge's stated reason
A receives a slight forced preference for more clearly separating evidence establishment and approved uncertainty tolerance from rollout authorization. B is more operationally concrete and could be more useful once the measurement basis is confirmed. This is not an established material quality gap; an independent review could reasonably favor B.
This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.
Battle wave: 1b476a75-dc9d-420a-b880-646a1c496a4f. Pair: brp1_4ee15bdf4db61e6c48710a5a8ae340baec56d980478b658250eb17efb5c72bd7. A separate independent review is required before calling a concern a verified factual defect. Judge disagreement is not recorded here.