← Model losses

Head-to-head comparison

openai / gpt-6-luna / low / low effort preferred over claude-code-cli / claude-haiku-5-5 / medium / medium effort · close win.

Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.

Reviewed public evidence

Task goal

Read-only data analysis. TeamA completed90 of100jobs; teamB completed10 of20jobs. A dashboard averages their completion percentages and shows70percent for the combined organization. The next week changes the team mix. Identify the aggregation defect, compute the defensible current combined rate, and specify minimal counts/time-window/state definitions needed for a useful comparison. Explain why a change in the aggregate may not imply either team improved. No tools or executed-test claims. Three numbered items, under180words.

openai / gpt-6-luna / low / low effort answer

1. The defect is an unweighted average of team rates: it gives the smaller team equal influence. Current combined rate is (90 + 10) / (100 + 20) = **83.3%**, not 70%.

2. A useful comparison needs completed and eligible job counts for each team and the organization, for the same defined time window, with consistent rules for what counts as a job and as completed (including treatment of in-progress, canceled, or reopened jobs).

3. A changed aggregate may reflect a changed team mix rather than improvement within either team: teams with different rates contribute different weights. Compare each team’s rate across like-for-like windows, alongside the weighted organization rate.

claude-code-cli / claude-haiku-5-5 / medium / medium effort answer

1. **Aggregation defect:** The dashboard takes an unweighted mean of team percentages, (90% + 50%) / 2 = 70%, so TeamB's 20 jobs count as much as TeamA's 100. The defensible combined rate is pooled: 100 completed / 120 jobs = **83.3%**. Averages of rates are not rates of pooled counts, and the unweighted figure changes whenever the team mix changes.

2. **Minimal definitions for a useful comparison:**
   - **Counts:** completed jobs and total jobs per team, per period. Report rates only alongside these counts.
   - **Time window:** a fixed window (e.g., calendar week) keyed to job creation date, with a maturity cutoff so in-flight jobs aren't scored as incomplete.
   - **State:** an explicit list of terminal "completed" states, plus exclusions (cancelled, duplicate, retried).
   - **Organization rate:** sum(completed) / sum(jobs), optionally standardized to a fixed reference mix.

3. **Why the aggregate can move without either team improving:** If the share of jobs from the lower-completion team rises, the pooled rate falls even if both teams' rates are unchanged. Small denominators (TeamB has 20 jobs) make week-to-week rates noisy, and definition or censoring changes can shift numerators. Compare per-team rates with their counts, and decompose any aggregate change into within-team rate effects and mix effects.

*Uncertainty:* The packet does not define "completed," the time window, or cohort assignment. I assumed those definitions above.

Primary judge's stated reason

B earns a slight forced preference because it avoids confusing the dashboard's unweighted statistic with the pooled statistic when explaining mix changes. A's correct later explanation and useful comparison guidance substantially offset that advantage; this is not an established material quality gap.

This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.

Battle wave: c11431c3-92bf-4dae-a0a0-935993cba33e. Pair: brp1_570f14f180b2bb9d605dffbd31e12e89876ab75f7fc1bd6aa31a3fee553c8df4. A separate independent review is required before calling a concern a verified factual defect. Judge disagreement is not recorded here.