← Model losses

Head-to-head comparison

claude-code-cli / claude-opus-5-5 / medium / medium effort preferred over claude-code-cli / claude-haiku-5-5 / low / low effort · close win.

Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.

Reviewed public evidence

Task goal

Read-only planning analysis. TasksA andB start immediately and take2and4days. C takes3days afterA; D takes2days afterbothB andC; E takes1day afterD. Capacity permits all independent tasks in parallel. Find the earliest completion and critical path. A team proposes cuttingBby2days to save2days overall. Evaluate that claim and name a more useful reduction, including the smallest uncertainty/ownership checks before committing a deadline. No tools or executed-test claims. Three numbered items, under180words.

claude-code-cli / claude-opus-5-5 / medium / medium effort answer

1. **Earliest completion is day 8. The critical path is A→C→D→E.**
   - A runs days 0–2, then C runs days 2–5.
   - B runs days 0–4, so it has 1 day of slack.
   - D starts when both B and C are done (day 5) and finishes day 7. E finishes day 8.
   - Confidence: high, assuming finish-to-start links and fixed durations.

2. **Cutting B by 2 days saves nothing.** B is not on the critical path, so D still starts at day 5 and the project still ends at day 8.
   - Cutting C by 1 day gives day 7. Cutting C further gains nothing, because B→D→E becomes critical at 7 days.
   - Cutting D is more useful because both paths feed it. Each day removed from D, up to 2, saves a full day, with no new bottleneck.
   - Cutting E by 1 day also saves 1 day.

3. **Check these before committing to a deadline:**
   - **Estimate ranges:** get the likely range for A, C and D. B has only 1 day of slack, so if B slips more than 1 day it becomes critical.
   - **D's owner:** confirm who owns D and that the cut is feasible and won't hurt quality.
   - **The dependency itself:** confirm D truly needs B and C fully finished, not partly.
   - **People and handoffs:** confirm C's owner is free at day 2 and the D-to-E handoff is clear.
   - Without these checks, commit to day 8 with a buffer rather than day 7 or 6.

claude-code-cli / claude-haiku-5-5 / low / low effort answer

1. **Baseline:** The earliest completion is day 8. The critical path is A→C→D→E (2+3+2+1 = 8 days). The B→D→E chain finishes on day 7, leaving B one day of slack. Confidence is high given the stated durations and dependencies.

2. **The B-cut claim is wrong.** Cutting B from 4 to 2 days finishes B on day 2, but D still cannot start until C finishes on day 5. The overall finish stays at day 8, so the change saves 0 days, not 2. Only reductions on the critical path shorten the schedule.

3. **More useful lever:** Shorten D, which sits on both chains. Cutting D by 1 day gives an 8→7 day finish. Before committing a deadline, confirm the A and C durations and that C has no hidden dependency beyond A. Also confirm D's owner and that D can start the moment B and C finish. These are the smallest checks that could move the answer.

Primary judge's stated reason

B receives a slight, forced preference because explicitly validating the feasibility of the proposed cut makes its deadline recommendation marginally more actionable. This is not an established material quality gap; A offers an accurate and more economical alternative, and an independent review could reasonably reject this preference.

This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.

Battle wave: dd52f0cd-a901-4236-948d-93e82281c19b. Pair: brp1_700b4052bcbace6d3f12750681066f76124535929ddc8805324a1a3cadb393c5. A separate independent review is required before calling a concern a verified factual defect. Judge disagreement is not recorded here.