← Model losses

Head-to-head comparison

claude-code-cli / claude-sonnet-5-5 / low / low effort preferred over openai / gpt-6-sol / medium / medium effort · close win.

Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.

Reviewed public evidence

Task goal

Read-only debugging analysis. A job should run once for each local calendar day in America/Los_Angeles. The implementation adds24hours to the prior UTC timestamp and uses the UTC date as its deduplication key. Operators may retry after an ambiguous response. Identify the daylight-saving and calendar identity failures; propose the smallest schedule/idempotency contract and two boundary cases to verify. Distinguish intended occurrence time from actual execution time. No tools, edits or executed-test claims. Three numbered items, under180words.

claude-code-cli / claude-sonnet-5-5 / low / low effort answer

1. **Failures:** Adding 24h to the previous UTC instant keeps the elapsed interval fixed but not the local wall time. A 09:00 run shifts to 10:00 on 2026-03-08 (spring forward) and to 08:00 on 2026-11-01 (fall back), and later runs inherit the drift. Local days are 23h or 25h long, so a run near midnight can be skipped or doubled. The UTC-date key also differs from the Los Angeles date. An evening Pacific run falls on the next UTC date, so two local days can collide, or one local day can get two keys. A late or retried execution used as the base moves the schedule off its intended time.

2. **Contract:** The key is `(job, LA local date)`. Compute the intended instant from that date plus a configured wall time using timezone rules, never from the previous run. Resolve a nonexistent local time to the next valid instant and an ambiguous one to the first occurrence. Store `intended_at` separately from `actual_started_at`. Enforce a unique constraint on the key with an atomic insert-or-return-existing, so a retry after an ambiguous response reuses the same occurrence.

3. **Boundary cases:**
   - 2026-03-08 with 02:30 local, which does not exist: expect one run for that date and the next run on 03-09 at the intended wall time.
   - 2026-11-01 with 01:30 local, which occurs twice: expect one run, and a retry across the repeated hour or across UTC midnight creates no second execution.

openai / gpt-6-sol / medium / medium effort answer

1. **DST failure:** Adding 24 hours in UTC does not preserve a Los Angeles wall-clock time. A daily 09:00 job needs a 23-hour UTC interval across spring-forward and a 25-hour interval across fall-back; otherwise it shifts to 10:00 or 08:00 locally.

2. **Smallest contract:** Define each occurrence by its *intended* Los Angeles calendar date and local scheduled time, with an explicit policy for nonexistent or repeated wall-clock times. Use that intended date as a durable, unique idempotency key. Retries reuse the same key regardless of when execution actually occurs; the execution timestamp is audit data, not occurrence identity. A UTC execution-date key can split one occurrence across midnight or conflate different intended dates.

3. **Boundary checks:** Verify the scheduled wall-clock time and distinct date keys on both sides of spring-forward and fall-back. Separately, retry one intended occurrence after its first attempt crosses UTC midnight, and verify it cannot run twice.

Primary judge's stated reason

B receives a slight forced preference because its atomic admission mechanism and concrete DST boundary expectations make the proposed contract easier to implement and verify. A provides substantially equivalent core guidance, and its cleaner calendar-identity explanation counterbalances B's extra specificity. This is not an established material quality gap; an independent review could reasonably reject the preference.

This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.

Battle wave: 49ae91a5-1393-4cc3-b007-47ffcd72397c. Pair: brp1_70f06b346f0ba3629bd2679068fd04b4fc9c625cdc72f31f11516d5fbc4e4c23. A separate independent review is required before calling a concern a verified factual defect. Judge disagreement is not recorded here.