claude-code-cli / claude-opus-5-5 / high / high effort preferred over claude-code-cli / claude-sonnet-5-5 / high / high effort · close win.
Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.
Reviewed public evidence
Task goal
Read-only research analysis. A prototype automation increases completed tasks by30percent after launch. The rollout coincided with extra staffing, task definitions changed, and users selfselected into the pilot. Logs omit abandoned tasks; the team wants to scale based on before/after throughput. Design the smallest credible prospective experiment, define denominator and guardrails, and state an explicit scaling decision criterion. Explain the remaining limitations if random assignment is impossible. No outside sources, tools or executed-test claims. Three numbered items, under180words.
claude-code-cli / claude-opus-5-5 / high / high effort answer
1. **Smallest credible experiment:** Randomly assign eligible tasks, or team-weeks stratified by team, to either the automation or the current process for 4–6 weeks. Keep task definitions and staffing frozen across both arms. Pre-register the metrics, the sample size, and the analysis plan.
2. **Denominator, guardrails, and decision rule:**
- **Primary metric:** completed tasks ÷ all started tasks, including abandoned ones, which must now be logged. Analyze by assigned arm (intention-to-treat), not by who actually used the tool.
- **Guardrails:** error or rework rate, cycle time, escalations, complaints, and staff hours per completed task.
- **Scale only if** the lower bound of the 95% interval for completion-rate lift exceeds a pre-set minimum (for example, +5 points) and no guardrail worsens beyond its pre-set margin.
3. **If random assignment is impossible:** Use a staggered rollout or matched comparison groups with difference-in-differences, keeping definitions and staffing fixed. Remaining risks include self-selection, concurrent staffing or policy shocks, non-parallel trends, novelty effects, spillover between groups, and measurement drift. Treat any lift as provisional and re-verify it after scaling.
claude-code-cli / claude-sonnet-5-5 / high / high effort answer
1. **Design and denominator:** Run a prospective staggered-start pilot. Assign eligible queues or teams to automation or control by pre-registered rule, freeze task definitions, and hold staffing fixed or record it. Analyze by assignment (intent-to-treat), not by who chose to use the tool. Instrument task creation so abandoned, timed-out and reopened tasks are logged. Denominator: all tasks created or assigned. Primary metric: completions per created task, with completions per staff-hour as secondary.
2. **Guardrails:** Track abandonment, rework or reopen rate, error rate, time-to-completion, escalations, user satisfaction and staffing hours. Set noninferiority margins before launch.
3. **Scaling criterion:** Scale only if the difference-in-differences in completion rate has a 95% CI lower bound of at least +10% relative, every guardrail stays within its margin, and the result holds after staffing adjustment. Otherwise iterate or extend the pilot.
**Limitations without randomization:** Concurrent time shocks, unobserved selection, violated parallel trends and spillovers between arms remain. Historical abandonment is unrecoverable, so the 30% figure stays non-causal. Results would be associational.
Primary judge's stated reason
B receives a weak preference because explicit randomization more directly addresses the central causal-identification problem before offering a nonrandomized fallback. A's stronger denominator coverage and staffing-normalized throughput measure substantially counterbalance that advantage. This is a slight forced preference, not an established material quality difference.
This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.
Battle wave: f13e5017-07c5-4f83-87eb-2908e3ac5236. Pair: brp1_741471dbe05c770fd709aec0daea4d00a362db04f4e5671a6404974c062a774a. A separate independent review is required before calling a concern a verified factual defect. Judge disagreement is not recorded here.