← Model losses

Head-to-head comparison

openai / gpt-6-astra / high / high effort preferred over claude-code-cli / claude-sonnet-5-5 / low / low effort · close win.

Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.

Reviewed public evidence

Task goal

Read-only data analysis. TeamA completed90 of100jobs; teamB completed10 of20jobs. A dashboard averages their completion percentages and shows70percent for the combined organization. The next week changes the team mix. Identify the aggregation defect, compute the defensible current combined rate, and specify minimal counts/time-window/state definitions needed for a useful comparison. Explain why a change in the aggregate may not imply either team improved. No tools or executed-test claims. Three numbered items, under180words.

openai / gpt-6-astra / high / high effort answer

1. **Aggregation defect:** The dashboard takes an unweighted mean: (90% + 50%)/2 = 70%, giving unequal-sized teams equal influence. The defensible organization-wide job completion rate is **(90 + 10)/(100 + 20) = 83.33%**, assuming comparable eligibility and no duplicate jobs across teams.

2. **Minimum comparison data:** For each team in each week, retain completed-job and eligible-job counts. Define matching window boundaries/time zone, eligibility/cohort rules, and observation cutoff; distinguish jobs completed during a week from completion of jobs entering that week. Define “completed” and treatment of pending, canceled, reopened, and reassigned jobs. Use consistent attribution and comparable follow-up time. Next-week counts and these definitions are not supplied, so no week-over-week conclusion is currently justified.

3. **Mix effect:** The aggregate weights team rates by eligible-job counts. A larger share of jobs assigned to Team A can raise the aggregate even if both teams stay at 90% and 50%; the reverse can lower it. Compare team-specific rates and, to separate performance from composition, calculate both weeks using fixed team weights.

claude-code-cli / claude-sonnet-5-5 / low / low effort answer

1. **Defect and rate:** The dashboard takes an unweighted mean of team percentages, (90% + 50%)/2 = 70%. That gives a 20-job team the same weight as a 100-job team. The defensible pooled rate is (90+10)/(100+20) = 100/120 = 83.3%. This assumes both teams count the same job population and "completed" means the same thing. Confidence is high on the arithmetic and moderate on the definitions, which the packet does not give.

2. **Minimum needed:** Store numerator and denominator per team, not just percentages.
   - Use one fixed time window, such as the weekly cohort of jobs created or due in that week.
   - Define states explicitly: completed, failed, canceled, open, and whether canceled jobs are excluded.
   - Count each job once, and state whether late completions are credited back to their original cohort.
   - Show per-team rates with counts or confidence intervals.

3. **Why the aggregate can move without improvement:** If the mix shifts toward teamB, the pooled rate falls even when both teams' rates stay the same (Simpson's-style mix effect). The reverse also holds. Different job difficulty, open-job backlog, or a change in the window can move it too. Compare same-team rates, or mix-standardized rates, with counts before claiming improvement.

Primary judge's stated reason

B receives a slight forced preference because its event-versus-cohort distinction and observation cutoff make the requested weekly comparison more directly operational. This is not a proven material quality gap; both answers substantially satisfy the task, and an independent review could reasonably reject this preference.

This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.

Battle wave: c11431c3-92bf-4dae-a0a0-935993cba33e. Pair: brp1_80426e12ecc61d1ee38d66101d1b851f4e741f0e467f2d44bd39ec7e92933a20. A separate independent review is required before calling a concern a verified factual defect. Judge disagreement is not recorded here.