openai / gpt-6-sol / medium / medium effort preferred over openai / gpt-6-sol / xhigh / xhigh effort · close win.
Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.
Reviewed public evidence
Task goal
Read-only research analysis. A prototype automation increases completed tasks by30percent after launch. The rollout coincided with extra staffing, task definitions changed, and users selfselected into the pilot. Logs omit abandoned tasks; the team wants to scale based on before/after throughput. Design the smallest credible prospective experiment, define denominator and guardrails, and state an explicit scaling decision criterion. Explain the remaining limitations if random assignment is impossible. No outside sources, tools or executed-test claims. Three numbered items, under180words.
openai / gpt-6-sol / medium / medium effort answer
1. Run a prospective, concurrent pilot: randomly assign eligible users or teams to automation or usual workflow before tasks arrive. Keep staffing comparable, freeze task definitions, and pre-set the duration and sample size. Analyze everyone as assigned, including nonusers.
2. Use **all eligible tasks entering the workflow** as the denominator, including abandoned tasks; measure completed tasks against that total. Also track completions per staffed hour. Guardrails: errors, rework, task time, user workload, and adverse outcomes. Record these for both groups.
3. Scale only if the pre-specified analysis shows at least a 10% improvement in completion rate, its uncertainty interval excludes no improvement, and no guardrail materially worsens. The reported 30% before/after increase cannot establish causation. If randomization is impossible, compare matched groups over the same period with identical logging and definitions, but staffing differences, selection, and unmeasured trends can still explain the result.
openai / gpt-6-sol / xhigh / xhigh effort answer
1. **Run a prospective, concurrent pilot:** Randomly assign eligible users to automation or control, balancing task mix and staffing; assign whole teams instead if users share work or practices. Freeze task definitions and record every eligible task at intake, including abandoned tasks. Predefine the sample size and evaluation window.
2. **Measure and decide:** Use the fraction of *all eligible incoming tasks* completed to the fixed standard within the window—not completed-task counts alone. Track quality, completion time, abandonment, and staff-hours per task. Scale only if the lower bound of a 95% confidence interval shows at least a 10% relative completion improvement, with no prespecified material deterioration in guardrails.
3. **If randomization is impossible:** Compare contemporaneous, closely matched groups using the same definitions, staffing records, and pre-launch trends. This is more informative than before/after throughput, but unmeasured differences and self-selection can still explain the result; treat a favorable finding as provisional, not proof that automation caused the reported 30% increase.
Primary judge's stated reason
B receives a slight forced preference because explicitly retaining nonusers makes the analysis population easier to implement without reintroducing adoption-based selection. A's stronger scaling assurance and explicit completion standard make this a close tradeoff, not an established material quality difference. An independent review could reasonably prefer A.
This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.
Battle wave: f13e5017-07c5-4f83-87eb-2908e3ac5236. Pair: brp1_817e6d3e2136687de9ff4ed8b61527235672c1a1ba587def178d6a44bb93a156. A separate independent review is required before calling a concern a verified factual defect. Judge disagreement is not recorded here.