← Model losses

Head-to-head comparison

openai / gpt-6-sol / none / none effort preferred over claude-code-cli / claude-haiku-5-5 / low / low effort · close win.

Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.

Reviewed public evidence

Task goal

Read-only planning analysis. A service has a monthly availability target99.9percent. A dashboard shows99.95percent for the first10days; the team proposes spending the remaining budget on a risky rollout. Traffic varies sharply byday, outages may be partial, and the dashboard excludes monitoring gaps. Explain the minimum evidence and decision gate for a staged rollout, including denominator, unknown intervals, rollback triggers and ownership. Avoid treating remaining calendar time as a known request budget. No tools or executed-test claims. Three numbered items, under180words.

openai / gpt-6-sol / none / none effort answer

1. **Establish the denominator.** For the first 10 days, obtain total eligible requests and failed requests, counting partial outages by affected requests. Reconcile the dashboard’s 99.95% with those counts. Estimate remaining-month traffic as a range, not a known budget derived from calendar days.

2. **Account for unknowns.** Identify monitoring gaps and their duration and likely traffic. Recover request outcomes where possible; otherwise show best- and worst-case monthly error-budget estimates. Do not count unobserved intervals as successful service.

3. **Gate the rollout.** An accountable service owner and incident commander should approve a small canary only if conservative estimates leave sufficient budget and monitoring can detect harm. Set stage-by-stage exposure limits, observation periods, and explicit rollback triggers for elevated failed-request rate, availability below the agreed threshold, or lost telemetry. Pause expansion on uncertainty; roll back immediately on a trigger.

claude-code-cli / claude-haiku-5-5 / low / low effort answer

1. **Denominator and budget:** Measure availability as good requests divided by valid requests over the full month, not as uptime over calendar time. The budget is 0.1% of expected valid requests, and remaining budget comes from actual request counts. The dashboard's 99.95% over 10 days is a time-based figure that omits monitoring gaps, so it doesn't establish how much budget is left. Traffic varies sharply by day, so report burn per window, not per calendar day.

2. **Unknown intervals and decision gate:** Bound the budget with a best case (gaps are healthy) and a worst case (gaps count as fully failed). Approve the risky rollout only if the worst-case remaining budget still covers the rollout's worst-case burn with a stated reserve. Require gap coverage below a set threshold, and advance each stage only after a minimum request count and a window that spans normal daily traffic cycles.

3. **Rollback triggers and ownership:** Predefine multi-window burn-rate triggers (for example, fast and slow windows), plus triggers for growth in unknown intervals or loss of SLI data. The rollout owner can halt without approval, the SLO owner approves each gate, and a named monitoring owner confirms data coverage before each stage. All thresholds are placeholders for the team to set.

Primary judge's stated reason

B is preferred because it asks the team to establish the dashboard's meaning rather than assuming it, and explicitly counts partial outages through affected requests. This is a weak comparative preference, not a proven material quality gap: A's more detailed stage-evidence requirements remain practically valuable, and neither answer demonstrates an actual rollout outcome.

This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.

Battle wave: 1b476a75-dc9d-420a-b880-646a1c496a4f. Pair: brp1_8610d0f1451d1f193cb634f3fb0b41549439fcae514cd98b73d967e01cbc73a5. A separate independent review is required before calling a concern a verified factual defect. Judge disagreement is not recorded here.