Head-to-head comparison

openai / gpt-6-astra / medium / medium effort preferred over openai / gpt-6-sol / none / none effort · close win.

Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.

Reviewed public evidence

Task goal

Read-only planning analysis. A service has a monthly availability target99.9percent. A dashboard shows99.95percent for the first10days; the team proposes spending the remaining budget on a risky rollout. Traffic varies sharply byday, outages may be partial, and the dashboard excludes monitoring gaps. Explain the minimum evidence and decision gate for a staged rollout, including denominator, unknown intervals, rollback triggers and ownership. Avoid treating remaining calendar time as a known request budget. No tools or executed-test claims. Three numbered items, under180words.

openai / gpt-6-astra / medium / medium effort answer

1. **Establish the denominator.** Independently assessed: 99.95% over ten days does not establish spendable monthly budget. Confirm whether the SLI measures eligible requests or service time, its exclusions, monthly boundary, and partial-failure accounting. Obtain good/total counts and traffic by interval and affected population; do not average daily percentages. For request-based availability, monthly failures must remain ≤0.001 × actual monthly eligible requests; future volume is uncertain.

2. **Account for unknowns.** Identify monitoring-gap intervals, affected traffic, and independent telemetry that could reconstruct outcomes. Never count excluded gaps as successful service. Bound unknown failures and denominator uncertainty conservatively. Forecast remaining traffic under multiple scenarios; remaining calendar days are not a known request budget. Current budget headroom is unproven without this evidence.

3. **Gate staged exposure.** Proceed only with reliable telemetry, conservative projected headroom, an explicit rollout-risk allocation and reserve, and a verified rollback path. Start with a small representative canary; expand after predefined observation windows and sufficient samples. Predetermine pause/rollback thresholds for burn rate, errors, latency, and telemetry loss. Name a rollout owner, monitoring on-call, rollback executor, and expansion approver.

openai / gpt-6-sol / none / none effort answer

1. **Establish the denominator.** For the first 10 days, obtain total eligible requests and failed requests, counting partial outages by affected requests. Reconcile the dashboard’s 99.95% with those counts. Estimate remaining-month traffic as a range, not a known budget derived from calendar days.

2. **Account for unknowns.** Identify monitoring gaps and their duration and likely traffic. Recover request outcomes where possible; otherwise show best- and worst-case monthly error-budget estimates. Do not count unobserved intervals as successful service.

3. **Gate the rollout.** An accountable service owner and incident commander should approve a small canary only if conservative estimates leave sufficient budget and monitoring can detect harm. Set stage-by-stage exposure limits, observation periods, and explicit rollback triggers for elevated failed-request rate, availability below the agreed threshold, or lost telemetry. Pause expansion on uncertainty; roll back immediately on a trigger.

Primary judge's stated reason

A receives a slight, forced preference because verifying the SLI definition makes its budget gate more robust to an unresolved premise. B counters with clearer mandatory pause and rollback actions. This is not an established material quality gap; an independent review could reasonably prefer B's operational directness.

This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.