claude-code-cli / claude-haiku-5-5 / medium / medium effort preferred over claude-code-cli / claude-opus-5-5 / medium / medium effort · clear win.
Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.
Reviewed public evidence
Task goal
Read-only planning analysis. A job API accepts300jobs/min; workers finish200/min. Queue age is rising. Jobs are idempotent by stable request ID, a timeout may hide successful acceptance, cancellation does not stop already committed work, and the team can add capacity only tomorrow. Propose a staged backpressure rollout today and tomorrow, with admission behavior, user-facing expectations, observability, rollback criteria and a way to avoid duplicate work. Do not assume new infrastructure or unlimited budget. No tools or implementation/test claims. Answer in three numbered items, under180words.
claude-code-cli / claude-haiku-5-5 / medium / medium effort answer
1. **Admission.** Today, cap accepted intake at about 180 jobs/min with a token bucket. At 300/min in against 200/min out, the backlog grows by 100/min. At 180, it drains by about 20/min. Excess requests get 429 with Retry-After and jitter, so nothing is silently queued. Tomorrow, after added capacity, step the cap 180→220→260→300, holding each step about 30 minutes and advancing only while queue age falls.
2. **User expectations and duplicates.** Show users "accepted, queued, estimated wait" or "retry shortly." On timeout, clients retry with the same stable request ID, and the API returns the existing job's status instead of creating new work. Cancellation is best-effort: cancel only pre-commit jobs. For committed jobs, show "will complete," not "cancelled."
3. **Observability and rollback.** Monitor queue age p50/p95, accept vs. drain rate, 429 rate, duplicate-ID hits, retries per ID, and worker failure rate. Roll back one step to the previous cap if queue age rises across two consecutive 10-minute windows, worker failures exceed baseline, or retry volume spikes. Keep the cap in config so rollback needs no deploy.
claude-code-cli / claude-opus-5-5 / medium / medium effort answer
1. **Today, admission:** Cap accepted jobs near the drain rate, about 190–200/min, with a small burst allowance, so the backlog stops growing. Reject the excess with 429 or 503, a Retry-After header and an ETA based on current queue age. Clients must retry with the same stable request ID. The API dedupes on that ID and returns the existing job's state, so a timed-out but accepted submit never runs twice. Tell users that cancellation only stops jobs not yet committed.
2. **Observability and rollback:** Track admitted vs. completed rate, queue depth, oldest job age, 429 ratio, dedupe-hit ratio, retries per client and p95 completion time. Loosen the cap in steps if rejections stay high but queue age doesn't fall within about 30 minutes. Do the same if retry storms raise total load or duplicate executions appear. Tighten the cap if age still rises.
3. **Tomorrow:** Add capacity in steps. Raise the cap to about 0.9× the measured completion rate until the backlog drains. Keep idempotency and Retry-After permanently. Remove the emergency cap only after queue age stays stable through a full peak cycle.
Uncertainty: the dedupe retention window and real client retry behavior aren't known from the evidence.
Primary judge's stated reason
B is preferable because its rollback guidance more consistently protects the constrained workers and queue, and its initial 180/min cap explicitly creates backlog-draining headroom. The rollback difference is a substantive planning advantage, not merely a forced stylistic preference, although neither plan has demonstrated operational results.
This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.
Battle wave: cbcda8f6-ef34-4721-876e-746245603c97. Pair: brp1_a67e6339aa55675ea30ce21e4d45770a711471fcb4337bc68fc203a235aca6ca. A separate independent review is required before calling a concern a verified factual defect. Judge disagreement is not recorded here.