← Model losses

Head-to-head comparison

openai / gpt-6-astra / medium / medium effort preferred over claude-code-cli / claude-opus-5-5 / medium / medium effort · close win.

Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.

Reviewed public evidence

Task goal

Read-only planning analysis. A service has a monthly availability target99.9percent. A dashboard shows99.95percent for the first10days; the team proposes spending the remaining budget on a risky rollout. Traffic varies sharply byday, outages may be partial, and the dashboard excludes monitoring gaps. Explain the minimum evidence and decision gate for a staged rollout, including denominator, unknown intervals, rollback triggers and ownership. Avoid treating remaining calendar time as a known request budget. No tools or executed-test claims. Three numbered items, under180words.

openai / gpt-6-astra / medium / medium effort answer

1. **Establish the denominator.** Independently assessed: 99.95% over ten days does not establish spendable monthly budget. Confirm whether the SLI measures eligible requests or service time, its exclusions, monthly boundary, and partial-failure accounting. Obtain good/total counts and traffic by interval and affected population; do not average daily percentages. For request-based availability, monthly failures must remain ≤0.001 × actual monthly eligible requests; future volume is uncertain.

2. **Account for unknowns.** Identify monitoring-gap intervals, affected traffic, and independent telemetry that could reconstruct outcomes. Never count excluded gaps as successful service. Bound unknown failures and denominator uncertainty conservatively. Forecast remaining traffic under multiple scenarios; remaining calendar days are not a known request budget. Current budget headroom is unproven without this evidence.

3. **Gate staged exposure.** Proceed only with reliable telemetry, conservative projected headroom, an explicit rollout-risk allocation and reserve, and a verified rollback path. Start with a small representative canary; expand after predefined observation windows and sufficient samples. Predetermine pause/rollback thresholds for burn rate, errors, latency, and telemetry loss. Name a rollout owner, monitoring on-call, rollback executor, and expansion approver.

claude-code-cli / claude-opus-5-5 / medium / medium effort answer

1. **Denominator and budget.** Recompute the SLI from request-weighted good and total events, not dashboard time. Count partial outages by the fraction of requests that failed. Remaining budget equals 0.1% of the *forecast* monthly total requests, minus bad requests so far. Traffic swings sharply by day, so the forecast is a range. Use its low bound. "Twenty days left" is not a request budget.

2. **Unknown intervals.** Excluded monitoring gaps are not good time. Measure each gap's duration and its likely traffic. Either count it as bad, or bound it with independent sources such as load-balancer logs or client telemetry. Recompute the 99.95% under that worst case. If little budget remains (illustrative threshold: under half), there is no rollout.

3. **Gate, rollback and ownership.** Stage the rollout as canary, then about 10%, about 50%, then full, with a hold at each stage. Roll back automatically on SLI breach, a fast burn-rate alert, or a stage using more than its preset slice of remaining budget. The rollback path must be rehearsed. One named rollout owner holds abort authority, and the SLO owner or on-call approves each stage. Pause if traffic forecasts or monitoring degrade.

Primary judge's stated reason

A is weakly preferred because confirming the actual SLI avoids authorizing rollout against a potentially different availability measure. B's more concrete operational controls counterbalance that advantage. This is a slight forced preference, not an established material quality gap; an independent review could reasonably favor B's operational specificity.

This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.

Battle wave: 1b476a75-dc9d-420a-b880-646a1c496a4f. Pair: brp1_bbbcdde0d88d9ab9103be3dce5588cff13ad549b2b6ff87ef8af21123b9808c5. A separate independent review is required before calling a concern a verified factual defect. Judge disagreement is not recorded here.