openai / gpt-6-luna / high / high effort preferred over claude-code-cli / claude-opus-5-5 / high / high effort · close win.
Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.
Reviewed public evidence
Task goal
Read-only research analysis. A prototype automation increases completed tasks by30percent after launch. The rollout coincided with extra staffing, task definitions changed, and users selfselected into the pilot. Logs omit abandoned tasks; the team wants to scale based on before/after throughput. Design the smallest credible prospective experiment, define denominator and guardrails, and state an explicit scaling decision criterion. Explain the remaining limitations if random assignment is impossible. No outside sources, tools or executed-test claims. Three numbered items, under180words.
openai / gpt-6-luna / high / high effort answer
1. Run a small, concurrent 1:1 randomized pilot among eligible users, assigning users (not individual tasks) to automation or usual workflow to limit spillover. Keep staffing and task definitions consistent, record assignment and every eligible task, and analyze by assigned group.
2. Define the denominator as all eligible tasks assigned during the pilot; count abandoned or unfinished tasks as not completed. Track completion rate plus guardrails for quality/rework, errors, and time per task. Scale only if the completion-rate lift’s pre-specified 95% confidence interval is entirely above zero and no guardrail crosses a pre-set unacceptable threshold.
3. If randomization is impossible, use concurrent comparable controls and adjust for baseline differences, but treat results as weaker: self-selection and unmeasured differences or time trends can still explain the lift. Missing abandonment records or changing task definitions would further undermine the comparison; do not scale on before/after throughput alone.
claude-code-cli / claude-opus-5-5 / high / high effort answer
1. **Smallest credible experiment:** Randomly assign eligible tasks, or team-weeks stratified by team, to either the automation or the current process for 4–6 weeks. Keep task definitions and staffing frozen across both arms. Pre-register the metrics, the sample size, and the analysis plan.
2. **Denominator, guardrails, and decision rule:**
- **Primary metric:** completed tasks ÷ all started tasks, including abandoned ones, which must now be logged. Analyze by assigned arm (intention-to-treat), not by who actually used the tool.
- **Guardrails:** error or rework rate, cycle time, escalations, complaints, and staff hours per completed task.
- **Scale only if** the lower bound of the 95% interval for completion-rate lift exceeds a pre-set minimum (for example, +5 points) and no guardrail worsens beyond its pre-set margin.
3. **If random assignment is impossible:** Use a staggered rollout or matched comparison groups with difference-in-differences, keeping definitions and staffing fixed. Remaining risks include self-selection, concurrent staffing or policy shocks, non-parallel trends, novelty effects, spillover between groups, and measurement drift. Treat any lift as provisional and re-verify it after scaling.
Primary judge's stated reason
A receives a slight forced preference because its denominator better protects the requested scaling decision against gains attributable only to selecting which work starts. B offers stronger practical-effect gating and planning detail. This is not an established material quality difference, and an independent review could reasonably prefer B.
This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.
Battle wave: f13e5017-07c5-4f83-87eb-2908e3ac5236. Pair: brp1_c762dc9edb0e3d6fa42c5b145ae6880ffe297deafd029f1cb7a4c03591047832. A separate independent review is required before calling a concern a verified factual defect. Judge disagreement is not recorded here.