← Model losses

Head-to-head comparison

openai / gpt-6-astra / low / low effort preferred over openai / gpt-6-sol / none / none effort · close win.

Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.

Reviewed public evidence

Task goal

Read-only planning analysis. A service has a monthly availability target99.9percent. A dashboard shows99.95percent for the first10days; the team proposes spending the remaining budget on a risky rollout. Traffic varies sharply byday, outages may be partial, and the dashboard excludes monitoring gaps. Explain the minimum evidence and decision gate for a staged rollout, including denominator, unknown intervals, rollback triggers and ownership. Avoid treating remaining calendar time as a known request budget. No tools or executed-test claims. Three numbered items, under180words.

openai / gpt-6-astra / low / low effort answer

1. **Establish the denominator.** Confirm whether the monthly SLI measures eligible requests or service time, its scope, exclusions, and partial-failure weighting. Obtain raw good/total counts and traffic by interval and affected cohort. For request-based availability, budget is 0.001 × monthly eligible requests; the eventual denominator is unknown. Ten days at 99.95% does not establish spendable monthly headroom.

2. **Account for uncertainty.** Reconcile monitoring gaps using independent telemetry; otherwise classify them as unknown, not successful or silently excluded. Bound their possible failures and denominator impact. Require traffic scenarios, existing budget consumption, and estimated rollout exposure, including detection and rollback delay. Calendar time cannot substitute for future request volume. Hold if conservative bounds cannot demonstrate sufficient reserve.

3. **Gate each stage.** Start with a small, representative canary; expand only after predefined minimum request volume and observation duration, healthy cohort-level SLIs, and acceptable short- and long-window budget burn. Predetermine numeric stop/rollback thresholds for failures, burn, telemetry loss, and customer-impact guardrails. Name the rollout decision owner and on-call rollback executor, confirm rollback readiness, and require explicit approval before each expansion.

openai / gpt-6-sol / none / none effort answer

1. **Establish the denominator.** For the first 10 days, obtain total eligible requests and failed requests, counting partial outages by affected requests. Reconcile the dashboard’s 99.95% with those counts. Estimate remaining-month traffic as a range, not a known budget derived from calendar days.

2. **Account for unknowns.** Identify monitoring gaps and their duration and likely traffic. Recover request outcomes where possible; otherwise show best- and worst-case monthly error-budget estimates. Do not count unobserved intervals as successful service.

3. **Gate the rollout.** An accountable service owner and incident commander should approve a small canary only if conservative estimates leave sufficient budget and monitoring can detect harm. Set stage-by-stage exposure limits, observation periods, and explicit rollback triggers for elevated failed-request rate, availability below the agreed threshold, or lost telemetry. Pause expansion on uncertainty; roll back immediately on a trigger.

Primary judge's stated reason

B receives a weak, forced preference because confirming the SLI basis reduces the risk of authorizing rollout against the wrong accounting denominator. This is not an established material quality gap: A offers a useful, defensible request-based plan and clearer immediate rollback language. The comparative judgment remains uncertain and an independent review could reasonably prefer A.

This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.