openai / gpt-6-astra / medium / medium effort preferred over openai / gpt-6-sol / medium / medium effort · close win.
Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.
Reviewed public evidence
Task goal
Read-only research analysis. A prototype automation increases completed tasks by30percent after launch. The rollout coincided with extra staffing, task definitions changed, and users selfselected into the pilot. Logs omit abandoned tasks; the team wants to scale based on before/after throughput. Design the smallest credible prospective experiment, define denominator and guardrails, and state an explicit scaling decision criterion. Explain the remaining limitations if random assignment is impossible. No outside sources, tools or executed-test claims. Three numbered items, under180words.
openai / gpt-6-astra / medium / medium effort answer
1. Independently assessed: the reported 30% increase is not causal evidence. Run a concurrent randomized pilot assigning eligible users to automation or usual workflow; randomize teams if spillovers are likely. Keep staffing, task definitions, and intake rules identical; stratify by task mix. Prespecify sample size and duration to detect a worthwhile gain, accounting for clustering; avoid early stopping based on favorable results.
2. Primary outcome: independently quality-validated completions within a fixed follow-up window divided by **all eligible incoming tasks** assigned to each arm, including abandoned, unfinished, and never-started tasks. Log intake before treatment exposure; analyze assignment regardless of adoption. Also measure validated completions per paid staff-hour. Prespecify guardrails for errors, rework, serious incidents, backlog, turnaround time, and workload.
3. Scale only if the primary effect’s 95% confidence-interval lower bound exceeds a prespecified worthwhile threshold, staff-hour productivity improves, and every guardrail meets prespecified noninferiority limits. Unknown baseline rates, costs, and tolerances prevent choosing numerical thresholds now. Without randomization, use matched concurrent controls and difference-in-differences with stable definitions and pretrend checks; self-selection, unmeasured staffing differences, and changing demand still limit causal attribution.
openai / gpt-6-sol / medium / medium effort answer
1. Run a prospective, concurrent pilot: randomly assign eligible users or teams to automation or usual workflow before tasks arrive. Keep staffing comparable, freeze task definitions, and pre-set the duration and sample size. Analyze everyone as assigned, including nonusers.
2. Use **all eligible tasks entering the workflow** as the denominator, including abandoned tasks; measure completed tasks against that total. Also track completions per staffed hour. Guardrails: errors, rework, task time, user workload, and adverse outcomes. Record these for both groups.
3. Scale only if the pre-specified analysis shows at least a 10% improvement in completion rate, its uncertainty interval excludes no improvement, and no guardrail materially worsens. The reported 30% before/after increase cannot establish causation. If randomization is impossible, compare matched groups over the same period with identical logging and definitions, but staffing differences, selection, and unmeasured trends can still explain the result.
Primary judge's stated reason
B receives a slight forced preference because explicit fixed follow-up makes the proposed completion metric more operationally interpretable, supported by intake logging before treatment exposure. This is not an established material quality gap: A provides a credible, simpler design and a more immediately numerical decision rule.
This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.
Battle wave: f13e5017-07c5-4f83-87eb-2908e3ac5236. Pair: brp1_f414b2cff74dc82ab1f44b18599c197ee019aedba3e0ff43407cdfcb085433bc. A separate independent review is required before calling a concern a verified factual defect. Judge disagreement is not recorded here.