← Model losses

Head-to-head comparison

openai / gpt-6-sol / none / none effort preferred over claude-code-cli / claude-opus-5-5 / medium / medium effort · close win.

Primary judge: Sol 6.1, requested Low. Effective provider effort and internal attempts were not verified. A close win is still a scored preference; it does not establish a material defect.

Reviewed public evidence

Task goal

Read-only planning analysis. A service has a monthly availability target99.9percent. A dashboard shows99.95percent for the first10days; the team proposes spending the remaining budget on a risky rollout. Traffic varies sharply byday, outages may be partial, and the dashboard excludes monitoring gaps. Explain the minimum evidence and decision gate for a staged rollout, including denominator, unknown intervals, rollback triggers and ownership. Avoid treating remaining calendar time as a known request budget. No tools or executed-test claims. Three numbered items, under180words.

openai / gpt-6-sol / none / none effort answer

1. **Establish the denominator.** For the first 10 days, obtain total eligible requests and failed requests, counting partial outages by affected requests. Reconcile the dashboard’s 99.95% with those counts. Estimate remaining-month traffic as a range, not a known budget derived from calendar days.

2. **Account for unknowns.** Identify monitoring gaps and their duration and likely traffic. Recover request outcomes where possible; otherwise show best- and worst-case monthly error-budget estimates. Do not count unobserved intervals as successful service.

3. **Gate the rollout.** An accountable service owner and incident commander should approve a small canary only if conservative estimates leave sufficient budget and monitoring can detect harm. Set stage-by-stage exposure limits, observation periods, and explicit rollback triggers for elevated failed-request rate, availability below the agreed threshold, or lost telemetry. Pause expansion on uncertainty; roll back immediately on a trigger.

claude-code-cli / claude-opus-5-5 / medium / medium effort answer

1. **Denominator and budget.** Recompute the SLI from request-weighted good and total events, not dashboard time. Count partial outages by the fraction of requests that failed. Remaining budget equals 0.1% of the *forecast* monthly total requests, minus bad requests so far. Traffic swings sharply by day, so the forecast is a range. Use its low bound. "Twenty days left" is not a request budget.

2. **Unknown intervals.** Excluded monitoring gaps are not good time. Measure each gap's duration and its likely traffic. Either count it as bad, or bound it with independent sources such as load-balancer logs or client telemetry. Recompute the 99.95% under that worst case. If little budget remains (illustrative threshold: under half), there is no rollout.

3. **Gate, rollback and ownership.** Stage the rollout as canary, then about 10%, about 50%, then full, with a hold at each stage. Roll back automatically on SLI breach, a fast burn-rate alert, or a stage using more than its preset slice of remaining budget. The rollback path must be rehearsed. One named rollout owner holds abort authority, and the SLO owner or on-call approves each stage. Pause if traffic forecasts or monitoring degrade.

Primary judge's stated reason

B slightly better connects observability to permission to start and to the response after telemetry loss, reducing ambiguity about continuing exposed traffic without reliable detection. This is a forced, weak preference, not an established material quality gap; A offers stronger rollback-readiness and budget-accounting detail. An independent review could reasonably prefer that tradeoff.

This reason is the judge's assessment. No independent factual-defect finding is asserted by this record.

Battle wave: 1b476a75-dc9d-420a-b880-646a1c496a4f. Pair: brp1_fff3f1b2d6f842b6e5531f072a5b70491cd04c868d131c1ad3d656fe62b9d9d3. A separate independent review is required before calling a concern a verified factual defect. Judge disagreement is not recorded here.